Method: Meeting Comment Box

Southside Civic Association and Carol Ann Brown

Comment: 15. Are studies being done as to how this expansion may affect Baton Rouge’s Air Quality? Response: An air quality study is being conducted for this project. Results of […]

Kathy Stiles

Comment: Bridge near Concord Estates is damaged Response: Thank you for providing this information. DOTD has been made aware of the situation.

anonymous

Comment: Please take BR Fault line into consideration in bridge planning and construction. Response: Thank you for your comment. Seismic considerations were included in the bridge studies conducted in concert […]

anonymous

Comment: 9. How many lanes will Interstate 110 have and for how long? Response: If the question is relative to how many lanes will be open during construction, the answer […]

anonymous

Comment: 11. How long will Interstate 110 be one lane at the East side of the New Bridge? Response: Traffic Analysis shows that two lanes are required on I-10 Eastbound […]

anonymous

Comment: 12. How long will interstate 110 be two lanes at the eastern foot of the bridge? Response: Traffic Analysis shows that two lanes are required on I-10 Eastbound from […]

anonymous

Comment: 13. Interstate 10 backs up to the Louisiana 415 Lobdell interchange in West Baton Rouge every afternoon now, how much further will it be backed up during construction? Response: […]

anonymous

Comment: 14. Isn’t there supposed to be a Traffic management plan? If so is it available now, if not when will it be complete? 15. How will this traffic management […]

anonymous

Comment: 16. lsn’t this [traffic management] plan required to be made public now rather than later Response: A traffic management plan will be developed when geometry is approved and the […]

anonymous

Comment: 31. When will the detour routes be identified? Response: 31 – The traffic management plan will provide some detail on potential detour routes. This plan will be completed in […]